Search
  • Home
  • Equipment
    Concrete series

    CONCRETE SERIES

    Concrete multi-functional nondestructive testerConcrete strength tester Nonmetal ultrasonic detector Impact echo audio detector
    Prestressed series

    Prestressed series

    Multi function detector of prestressed concrete beam Quality detector for grouting density of duct Back pull effective prestress detector Prestressed anchor cable (pole) tension detector
    Pile pole series

    Pile pole series

    Low strain detector for foundation pile Foundation pile acoustic transmission detector Steel guardrail column buried depth shock elastic wave detector Bolt quality detector
    Assembled series

    Assembled series

    Assembled structure multi-function detector
    Series of geotechnical materials

    Series of geotechnical materials

    Falling ball type resilient modulus tester Falling ball tester for geotechnical mechanical properties Cross hole rock mass mechanical property detector Geotechnical acoustic wave tester
    Railway special series

    Railway special series

    Railway concrete structure scanner Multi function nondestructive testing instrument for ballastless track (type III) Knock type tunnel lining defect detector
    Fast inspection series (mobile platform)

    Fast inspection series (mobile platform)

    Knock type tunnel lining defect detector Knock type concrete filled steel tube void detector Knock type building decoration void detector Percussion fastener loosening inspection instrument
    Monitoring equipment series

    Monitoring equipment series

    Network multi-function monitoring and testing instrument
  • System
  • Service
  • New Product
  • Support
    Technical Q & A Technical solutions University programs Standard specification Case Video
  • ShengTuo
    About Us News Course Leader Qualification Investor
  • Contact
  • Link:

  • Chengdu Headquarters:028-68611510 / 028-68611516

    Fax:028-68611530

  • Address: Chengdu City, Sichuan Province, Wuhou District City, province, Wu Xing 28 Road, west 4, 7, five,

    E-mail: 2931371275@qq.com

  • 关注服务号

  • ©2019 Sichuan Central Inspection Technology Inc. All Rights Reserved.

    尊敬的客户:
          由于运营商电话线路故障,9月27日-10月27日,公司部分电话暂时无法使用,目前正在进行全力抢修,由此造成的不便深表歉意。

    为方便业务往来可直接拨打: 

    130-0811-2958

    >
    >
    >
    The second working meeting of "Technical Regulations for Prestressed Hole Grouting Compactness Shock Elastic Wave Detection" and "Technical Regulations for On-site Inspection of Elastic Modulus of Concrete Structures" was successfully held

    The second working meeting of "Technical Regulations for Prestressed Hole Grouting Compactness Shock Elastic Wave Detection" and "Technical Regulations for On-site Inspection of Elastic Modulus of Concrete Structures" was successfully held

    Classification:
    Company News
    Release time:
    2017/11/29 19:27
    Page view

      The second working meeting of China Building Materials Federation, China Concrete and Cement Products Association Standards "Technical Regulations for Non-destructive Testing of Prestressed Hole Grouting Compactness" and "Technical Regulations for On-site Inspection of Concrete Modulus Elastic Modulus" were held on November 22, 2017. Held in Hangzhou. China Concrete and Cement Products Association, China Metallurgical Construction Research Institute Co., Ltd., Sichuan Shengtuo Testing Technology Co., Ltd., Inner Mongolia Road and Bridge Engineering Technology Testing Co., Ltd., Liaoning Provincial Transportation Science Research Institute Co., Ltd., China Power Construction Guiyang Survey and Design Research Fourteen representatives from the Institute Co., Ltd., Fujian Academy of Building Sciences, Fujian Expressway Datong Inspection Co., Ltd., and Shandong Expressway Engineering Inspection Co., Ltd. attended the meeting.

     The meeting was chaired by Dr. Cao Qingyu, the chief institute of standard development of China Metallurgical Research Institute Co., Ltd. Participants heard the report by the editor-in-chief of Sichuan Shengtuo Testing Technology Co., Ltd. on the first draft of the two regulations, reviewed the content of the two regulations, and proposed amendments and suggestions for the content of the regulations.

     
    The establishment of the regulation standards is to provide a basis for field operation and testing. Therefore, it is of great significance to modify the regulations in accordance with the site conditions. "Technical Regulations for Detection of Shock Elastic Waves of Grouting Compactness of Prestressed Tunnels" and "Technical Regulations for On-site Inspection of Concrete Modulus Elastic Modulus" from the scope of use, definition of terms, testing equipment, testing methods, field testing, testing reports The grouting compactness test and the elastic modulus test of concrete structures are specified to provide a basis for field testing.

      The meeting revised and reviewed the first drafts of the two regulations, which laid the foundation for the formation of a draft for comments as soon as possible.

    The second working meeting of "Technical Regulations for Prestressed Hole Grouting Compactness Shock Elastic Wave Detection" and "Technical Regulations for On-site Inspection of Elastic Modulus of Concrete Structures" was successfully held

    Page view
    [Abstract]:
    ThesecondworkingmeetingofChinaBuildingMaterialsFederation,ChinaConcreteandCementProductsAssociationStandards"TechnicalRegulationsforNon-destructiveTestingofPrestressedHoleGroutingCompactness"and"TechnicalRegulationsforOn-siteInspectionofConcreteModulusElasticModulus"wereheldonNovember22,2017.HeldinHangzhou.ChinaConcreteandCementProductsAssociation,ChinaMetallurgicalConstructionResearchInstituteCo.,Ltd.,SichuanShengtuoTestingTechnologyCo.,Ltd.,InnerMongoliaRoadandBridgeEngineeringTechnologyTestingCo.,Ltd.,LiaoningProvincialTransportationScienceResearchInstituteCo.,Ltd.,ChinaPowerConstructionGuiyangSurveyandDesignResearchFourteenrepresentativesfromtheInstituteCo.,Ltd.,FujianAcademyofBuildingSciences,FujianExpresswayDatongInspectionCo.,Ltd.,andShandongExpresswayEngineeringInspectionCo.,Ltd.attendedthemeeting. ThemeetingwaschairedbyDr.CaoQingyu,thechiefinstituteofstandarddevelopmentofChinaMetallurgicalResearchInstituteCo.,Ltd.Participantsheardthereportbytheeditor-in-chiefofSichuanShengtuoTestingTechnologyCo.,Ltd.onthefirstdraftofthetworegulations,reviewedthecontentofthetworegulations,andproposedamendmentsandsuggestionsforthecontentoftheregulations. Theestablishmentoftheregulationstandardsistoprovideabasisforfieldoperationandtesting.Therefore,itisofgreatsignificancetomodifytheregulationsinaccordancewiththesiteconditions."TechnicalRegulationsforDetectionofShockElasticWavesofGroutingCompactnessofPrestressedTunnels"and"TechnicalRegulationsforOn-siteInspectionofConcreteModulusElasticModulus"fromthescopeofuse,definitionofterms,testingequipment,testingmethods,fieldtesting,testingreportsThegroutingcompactnesstestandtheelasticmodulustestofconcretestructuresarespecifiedtoprovideabasisforfieldtesting.  Themeetingrevisedandreviewedthefirstdraftsofthetworegulations,whichlaidthefoundationfortheformationofadraftforcommentsassoonaspossible.

      The second working meeting of China Building Materials Federation, China Concrete and Cement Products Association Standards "Technical Regulations for Non-destructive Testing of Prestressed Hole Grouting Compactness" and "Technical Regulations for On-site Inspection of Concrete Modulus Elastic Modulus" were held on November 22, 2017. Held in Hangzhou. China Concrete and Cement Products Association, China Metallurgical Construction Research Institute Co., Ltd., Sichuan Shengtuo Testing Technology Co., Ltd., Inner Mongolia Road and Bridge Engineering Technology Testing Co., Ltd., Liaoning Provincial Transportation Science Research Institute Co., Ltd., China Power Construction Guiyang Survey and Design Research Fourteen representatives from the Institute Co., Ltd., Fujian Academy of Building Sciences, Fujian Expressway Datong Inspection Co., Ltd., and Shandong Expressway Engineering Inspection Co., Ltd. attended the meeting.

     The meeting was chaired by Dr. Cao Qingyu, the chief institute of standard development of China Metallurgical Research Institute Co., Ltd. Participants heard the report by the editor-in-chief of Sichuan Shengtuo Testing Technology Co., Ltd. on the first draft of the two regulations, reviewed the content of the two regulations, and proposed amendments and suggestions for the content of the regulations.

     
    The establishment of the regulation standards is to provide a basis for field operation and testing. Therefore, it is of great significance to modify the regulations in accordance with the site conditions. "Technical Regulations for Detection of Shock Elastic Waves of Grouting Compactness of Prestressed Tunnels" and "Technical Regulations for On-site Inspection of Concrete Modulus Elastic Modulus" from the scope of use, definition of terms, testing equipment, testing methods, field testing, testing reports The grouting compactness test and the elastic modulus test of concrete structures are specified to provide a basis for field testing.

      The meeting revised and reviewed the first drafts of the two regulations, which laid the foundation for the formation of a draft for comments as soon as possible.

    No content information display available
    Please add data record on website background.