Search
  • Home
  • Equipment
    Concrete series

    CONCRETE SERIES

    Concrete multi-functional nondestructive testerConcrete strength tester Nonmetal ultrasonic detector Impact echo audio detector
    Prestressed series

    Prestressed series

    Multi function detector of prestressed concrete beam Quality detector for grouting density of duct Back pull effective prestress detector Prestressed anchor cable (pole) tension detector
    Pile pole series

    Pile pole series

    Low strain detector for foundation pile Foundation pile acoustic transmission detector Steel guardrail column buried depth shock elastic wave detector Bolt quality detector
    Assembled series

    Assembled series

    Assembled structure multi-function detector
    Series of geotechnical materials

    Series of geotechnical materials

    Falling ball type resilient modulus tester Falling ball tester for geotechnical mechanical properties Cross hole rock mass mechanical property detector Geotechnical acoustic wave tester
    Railway special series

    Railway special series

    Railway concrete structure scanner Multi function nondestructive testing instrument for ballastless track (type III) Knock type tunnel lining defect detector
    Fast inspection series (mobile platform)

    Fast inspection series (mobile platform)

    Knock type tunnel lining defect detector Knock type concrete filled steel tube void detector Knock type building decoration void detector Percussion fastener loosening inspection instrument
    Monitoring equipment series

    Monitoring equipment series

    Network multi-function monitoring and testing instrument
  • System
  • Service
  • New Product
  • Support
    Technical Q & A Technical solutions University programs Standard specification Case Video
  • ShengTuo
    About Us News Course Leader Qualification Investor
  • Contact
  • Link:

  • Chengdu Headquarters:028-68611510 / 028-68611516

    Fax:028-68611530

  • Address: Chengdu City, Sichuan Province, Wuhou District City, province, Wu Xing 28 Road, west 4, 7, five,

    E-mail: 2931371275@qq.com

  • 关注服务号

  • ©2019 Sichuan Central Inspection Technology Inc. All Rights Reserved.

    尊敬的客户:
          由于运营商电话线路故障,9月27日-10月27日,公司部分电话暂时无法使用,目前正在进行全力抢修,由此造成的不便深表歉意。

    为方便业务往来可直接拨打: 

    130-0811-2958

    >
    >
    >
    Compilation Meeting of "Technical Regulations for Anchor Bolt Support of Railway Tunnels" (Report for Approval) Was Held Successfully

    Compilation Meeting of "Technical Regulations for Anchor Bolt Support of Railway Tunnels" (Report for Approval) Was Held Successfully

    Classification:
    Company News
    Release time:
    2017/06/28 10:51
    Page view

      On June 24, 2017, the compilation meeting of "Technical Regulations for Bolt Support of Railway Tunnels" (reported for approval) was successfully held in Jinniu Hotel, Chengdu. The participants of the meeting were the Railway Corporation Identification Center, the Industrial Management Center, the Economic Management Institute, and the Iron Branch There are dozens of experts such as the Institute, Chenglan Company, and the chairman of the company Wu Jiazheng attended the meeting as a member of the compilation team.

     

      This regulation was edited by the China Railway Second Academy, and the company participated in the compilation with the China Railway Southwest Institute, Chengdu Hyundai Wantong Anchor Co., Ltd. and Hangzhou Tuqiang Engineering Materials Co., Ltd. As the participating unit of the Regulation, Chairman Wu Jiazheng reported to the participating experts on the compilation process, content and expert opinion handling of the "Anchor Rod Length and Anchor Density Testing" part of the procedure, which was unanimously approved by the participating experts. Subsequently, the participating experts discussed the regulations in detail one by one.

      Experts believe that the non-destructive testing technical requirements and relevant regulations for railway tunnel anchors are proposed for the first time in this code, which is of great significance for improving the quality and efficiency of railway tunnel anchor detection. At the same time, the regulations elaborated the information technology of tunnel anchor construction to make the anchor information traceable, which became an important highlight of this procedure.

     

      As this is the first time this regulation has been compiled, the compilation team has conducted extensive investigations on the construction sites of tunnel anchors in railway, water conservancy and hydropower, coal mines and iron ore industries. The detailed design, construction and testing of the rods have made detailed regulations, which is of great significance to standardize the construction process of the anchor rods and improve the construction quality of the anchor rods.

    Compilation Meeting of "Technical Regulations for Anchor Bolt Support of Railway Tunnels" (Report for Approval) Was Held Successfully

    Page view
    [Abstract]:
    OnJune24,2017,thecompilationmeetingof"TechnicalRegulationsforBoltSupportofRailwayTunnels"(reportedforapproval)wassuccessfullyheldinJinniuHotel,Chengdu.TheparticipantsofthemeetingweretheRailwayCorporat

      On June 24, 2017, the compilation meeting of "Technical Regulations for Bolt Support of Railway Tunnels" (reported for approval) was successfully held in Jinniu Hotel, Chengdu. The participants of the meeting were the Railway Corporation Identification Center, the Industrial Management Center, the Economic Management Institute, and the Iron Branch There are dozens of experts such as the Institute, Chenglan Company, and the chairman of the company Wu Jiazheng attended the meeting as a member of the compilation team.

     

      This regulation was edited by the China Railway Second Academy, and the company participated in the compilation with the China Railway Southwest Institute, Chengdu Hyundai Wantong Anchor Co., Ltd. and Hangzhou Tuqiang Engineering Materials Co., Ltd. As the participating unit of the Regulation, Chairman Wu Jiazheng reported to the participating experts on the compilation process, content and expert opinion handling of the "Anchor Rod Length and Anchor Density Testing" part of the procedure, which was unanimously approved by the participating experts. Subsequently, the participating experts discussed the regulations in detail one by one.

      Experts believe that the non-destructive testing technical requirements and relevant regulations for railway tunnel anchors are proposed for the first time in this code, which is of great significance for improving the quality and efficiency of railway tunnel anchor detection. At the same time, the regulations elaborated the information technology of tunnel anchor construction to make the anchor information traceable, which became an important highlight of this procedure.

     

      As this is the first time this regulation has been compiled, the compilation team has conducted extensive investigations on the construction sites of tunnel anchors in railway, water conservancy and hydropower, coal mines and iron ore industries. The detailed design, construction and testing of the rods have made detailed regulations, which is of great significance to standardize the construction process of the anchor rods and improve the construction quality of the anchor rods.

    No content information display available
    Please add data record on website background.